23694 HITS
Please Register here:
NEW PROJECT
INSTALLING DB2 DATABASE MANAGER
Working on the following steps:
1.
Data collection step:
Enable the collection of
request and activity metrics
within the DB2 database manager by setting the
mon_req_metrics
and
mon_act_metrics
database configuration
parameters to BASE or higher.
2.
Implementation step:
If you are using the IBM Optim
Performance Manager
(Optim PM) 4.1.1 or earlier, turn off the
Optim PM collection of workload
management statistics. As a result, the Optim
PM will not contain these
statistics within its repository for this
period and the statistics will not be
available for display.
WAKE NETWORK CURRICULUM
|
Current Projects
Installing Oracle 11g on Linux currently using
Oracle VM Virtual Manager
Testing out legacy applications on new operating systems
with VMshare
and Oracle VM while setting up a Red Hat Linux (64-bit) virtual
machine using VMware
ESX Server, and then continue with details on installing DB2
Enterprise 9 64-bit in that image.
Installed Xen now running three virtual machines. Each virtual machine is running a guest
operating system and applications independent of other virtual machines while
sharing the same physical resources. ll links to database in place and installed on three work stations in my lab. Installed
Red Hat Enterprise Linux Server 6.2 with patches in partition with Oracle VM
Virtual
Box
Manager. Also installed Debian Linux on one workstation. LDAP installation
now
in progress. Installing linux.x64_11gR2_client.zip for Oracle today...
Unzip
file not working, canceling operation, down level code.
Revising code, and now Using an LDAP Server for Oracle Java CAPS JMS IQ
Manager
User Management Install directly from Oracle Updated. Clue:
VLABS CISCO PROJECT
ZONE BASE VPN PROJECT
|